Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Aerospace
  • /
  • Solar farm to energise Bristol Airport's sustainability pledge

Aerospace

Solar farm to energise Bristol Airport's sustainability pledge

Leatherhead based provider of large-scale solar projects for private and public organisations, 3ti, has designed and delivered a 2.8-acre solar installation to Bristol Airport, helping it complete the next phase of its sustainability journey.

Image courtesy 3ti

The ground-mounted solar arrays will generate 1.5 GWh of sustainable electricity each year and, when combined with existing renewable energy on site, will cater for over 10% of the airport’s annual energy needs. Bristol Airport will use 3ti’s solar installation to reach its ambitious target of 25% self-sufficiency by 2025, building on its success of becoming the UK’s first carbon-neutral airport in 2021.

Advertisement
ODU RT

The 3ti project will also help the airport’s efforts in achieving net-zero operations by 2030, following a multi-million-pound investment into solar power, the removal of gas use, air source heat pumps and low-energy LED lighting.

For the Bristol Airport installation, 3ti has created a unique design, spreading  2,968 panels across three steel-framed structures that sit low to the ground, using recycled railway sleepers to negate the need for deep piling.

The solar installation will generate the equivalent amount of electricity needed to power 388 houses in the first year. Over its 25-year lifespan, it will save around 6,500 tonnes of CO2.

Richard Lees, Delivery Director at 3ti, said: “The installation at Bristol Airport posed a new set of challenges for us which involved many practical and functional considerations, including glare positioning and the impact on key stakeholders such as residents, airport users and the plane spotting community.

Advertisement
ODU RT

“We can now add airports to the list of destinations and workplaces that benefit from our installations providing renewable solar energy,” he concluded.

The 3ti is a specialist designer, installer, funder and operator of Solar Car Parks (SCPs). The 3ti team is responsible for the two largest SCPs in the UK, at Bentley Motors, Crewe and JP Morgan Chase, Bournemouth, is working on multi-site projects for the Ministry of Defence and has already installed around 15MWp of solar PV and covered almost 3,000 parking spaces around the country.

 

Advertisement
FIA2026 animated banner
Ontic introduces strategic teardown procurement initiative

Aerospace

Ontic introduces strategic teardown procurement initiative

23 April 2026

Ontic has introduced a new teardown procurement initiative to address one of the industry's most persistent challenges, namely the availability of hard-to-source components for established platforms.

Aurrigo opens advanced engineering hub in Coventry

Aerospace

Aurrigo opens advanced engineering hub in Coventry

22 April 2026

Provider of fully autonomous vehicles and mobile robotics platforms, Aurrigo, has announced the opening of its new UK Hub facility, marking a major milestone in the company’s growth and manufacturing capability.

Chapman Freeborn strengthens European passenger division

Aerospace

Chapman Freeborn strengthens European passenger division

22 April 2026

Chapman Freeborn has strengthened its European passenger division with new leadership appointments aimed at supporting growth across the region.

Aerospace Bristol appoints Lloyd Hughes as first COO

Aerospace

Aerospace Bristol appoints Lloyd Hughes as first COO

22 April 2026

Aerospace Bristol has appointed Lloyd Hughes as its first ever chief operating officer (COO), marking a significant milestone in the museum's development as it pursues its ambitious ten-year strategy to double visitor numbers and grow its commercial operations.

Advertisement
ODU RT
Hexagon unveils laser tech for aerospace inspections

Aerospace

Hexagon unveils laser tech for aerospace inspections

22 April 2026

Hexagon’s Manufacturing Intelligence Business Area today unveiled new laser-guided solutions that make it possible – in some cases for the first time – to automate inaccessible and large-scale quality inspections in labour-intensive operations such as aircraft assembly.

GKN Aerospace awarded Rolls-Royce engine repair contract

Aerospace

GKN Aerospace awarded Rolls-Royce engine repair contract

21 April 2026

GKN Aerospace has been awarded a new five-year contract with Rolls-Royce covering fan blade repairs for the RB211-535, Trent 700 and Trent 800 engine programmes.

Advertisement
ODU RT
Advertisement
Gulfstream banner