Advancing UK Aerospace, Defence, Security & Space Solutions Worldwide
  • Home
  • /
  • Aerospace
  • /
  • Satair Group UK first to meet aviation AS9110C:2016 & AS9120B:2016 quality standards

Aerospace

Satair Group UK first to meet aviation AS9110C:2016 & AS9120B:2016 quality standards

Satair Group UK has become the first organisation in the United Kingdom to meet the requirements of the new AS9110C:2016 and AS9120B:2016 quality management standards for the aviation industry.

This follows a detailed four-day audit by the British Standards Institute (BSI) that has led to the approvals being awarded and revised certificates issued.

The BSI confirmed that Satair Group UK is the first to be assessed and approved for both of these quality standards out of the more than 2,200 registered companies in the approvals database.

Advertisement
ODU RT

Jon Ravenhall, Head of Operations Repair Europe (UK) and Managing Director of Satair Group in the UK stated: “We are pleased to have passed this stringent new quality test and to be the first in the UK aerospace industry to do so. The feedback from the auditors is that these approvals are a great testimony to the work and commitment of all the staff in Satair Group UK.

“These approvals come at a significant time for Satair Group UK as we are in the final stages of preparing for a move early in 2018 to a brand new and much larger facility for aircraft battery maintenance and warehousing and with exciting new expansion plans to be unveiled soon.”

The AS/EN 9100 series of standards are the internationally recognised quality management standards for the aviation, defence and space industries and are operated by the International Aerospace Quality Group (IAQG).

The three main standards in the AS9100 series of Quality Management Systems (QMS) are:

Advertisement
Leonardo animated rectangle

• AS 9100 - QMS for quality assurance in design, development, production, installation and servicing
• AS 9110 - QMS for maintenance, repair and overhaul of aerospace/defence parts
• AS 9120 - QMS for quality assurance in stockholding and distribution of aerospace /defence parts

Jon Ravenhall added: “In preparation for the move to our new facility we wanted to start from a solid baseline. Transitioning to the new standards before the move to the new site made sense, especially as our EASA Part 145 and FAA Repair Station approvals will need to run concurrently at both locations to enable us to continue to provide the levels of service desired and expected by our customers. We have now set a date with the CAA auditor for the change of site verification audit, which allows us to transfer our current approvals to the new site.”

 

Advertisement
General Atomics LB
IATA reveals airlines constrained by aerospace supply chain bottlenecks

Aerospace

IATA reveals airlines constrained by aerospace supply chain bottlenecks

9 December 2025

In its recently released global outlook, the International Air Transport Association (IATA) has updated its analysis of aerospace supply chain bottlenecks, noting that aircraft availability remains one of the most significant constraints on industry growth.

Aurrigo launches licensing and hub programme

Aerospace

Aurrigo launches licensing and hub programme

9 December 2025

Coventry based Aurrigo International has launched a new international licensing and hub programme designed to accelerate its global commercialisation strategy.

Raytheon engineer recognised for inspiring the next generation

Aerospace Events

Raytheon engineer recognised for inspiring the next generation

9 December 2025

Flying Officer Ali Bachar, an engineer at Harlow-based Raytheon UK, has been honoured for his outstanding commitment to STEM education and youth engagement at the Regional Commandant Awards held at RAF Northolt.

Airbus completes acquisition of Spirit AeroSystems

Aerospace

Airbus completes acquisition of Spirit AeroSystems' sites

8 December 2025

Airbus has closed the transaction with Spirit AeroSystems for the acquisition of industrial assets dedicated to its commercial aircraft programmes, including those providing wing components for the A320 and A350 in Prestwick, Scotland and for A220 wings and A220 mid-fuselage production in Belfast.

Advertisement
ODU RT
Scottish Airspace Modernisation consultation reaches halfway point

Aerospace

Scottish Airspace Modernisation consultation reaches halfway point

8 December 2025

The Scottish Airspace Modernisation consultation, which launched on 20th October, has reached its midpoint, with the Coordinated Airspace Change Proposals (ACPs) - led jointly by NATS, Edinburgh Airport and Glasgow Airport - giving communities, political representatives and other stakeholders the opportunity to share their views.

GKN Aerospace to expand additive manufacturing capabilities in Norway

Aerospace

GKN Aerospace to expand additive manufacturing capabilities in Norway

8 December 2025

GKN Aerospace Norway and Norwegian Catapult Manufacturing Technology in Kongsberg (Kongsberg Technology Cluster) have signed a strategic agreement to invest in and expand advanced additive manufacturing capabilities at GKN Aerospace’s engines facility in Kongsberg.

Advertisement
Leonardo animated rectangle