in Space

Airbus' new satellite hub lays foundations for the future

Posted 15 May 2017 · Add Comment

With the ceremonial laying of the foundation stone for the new Integrated Technology Centre (ITC), Airbus marks the commencement of the intensive construction phase for its new €43 million satellite hub.


Copyright Airbus DS GmbH


The ultra-modern building (above), for the development and integration of satellites, will enable Airbus' Friedrichshafen site to handle future satellite requirements.

The ITC - featuring complex technology and equipment that are unique in Europe - enables various clean room classes in the central integration hall and is set to be built in record time.

Plans call for the structure to be “enclosed” and interior work to begin in just six months. The centre is to begin operations in late summer 2018, and at full capacity up to eight large satellites will be able to be integrated simultaneously.

At the heart of the four-storey Integrated Technology Centre, which will have a partial basement and a footprint of 4,250 m², is a central clean room for the development and construction of satellites. With dimensions of around 70 x 60 metres and a roof height of 20 metres, the building will expand the site’s current satellite integration capabilities. The new ‘dual’ complex enables more efficient and cost-effective project execution and, in addition to leading-edge technology, also offers new possibilities for acquiring future space projects.

Over 2,000 m² in size, the central integration hall of the new structure enables the simultaneous construction of up to eight large satellites and integration of complex subsystems and payloads. This area can be operated in clean room classes ISO 5 to ISO 8 without the need for partitioning into separate rooms that is otherwise standard procedure.

The two other wings of the building provide a further 1,000 m2 of integration and laboratory space for component manufacturing, and include a large visitor area and technical areas.

The transitional area to the existing integration building will contain material and employee
airlocks as well as goods receipt control.

The sophisticated, high-tech ventilation system of the building, unique in Europe, will enable particle reduction and help to prevent molecular contamination. The unique configuration of the ventilation system cuts operating costs by up to 70% compared to conventional system technology and enables clean room classes to be flexibly configured within the available space.

 

* required field

Post a comment

Other Stories
Advertisement
Latest News

Azores Airlines takes delivery of its first A321neo

Azores Airlines has taken delivery of its first Airbus A321neo aircraft, to become first Portuguese A320neo Family operator.

Serco signs Copernicus data access contract with ESA

Serco's business in Italy has been awarded a contract by the European Space Agency (ESA) to deliver a ground-breaking project to facilitate open and unlimited access to earth observation data and geospatial information collected as

All change at the top of Airbus

The Airbus Board of Directors has today announced executive changes as Tom Enders (59) has advised them he won't seek another term as CEO beyond his current mandate (which runs until the 2019 Annual Shareholders Meeting April 2019)and

ADS highlights industry need for transition agreement in early 2018

ADS said today that although confirmation that talks can start on transition and our future relationship with the EU is welcome progress, industry now needs to see urgent agreement reached on transition arrangements.

Astronaut Tim Peake opens UTC Portsmouth

Two years after blasting off to join the International Space Station, British astronaut Tim Peake formally opened the Roya Navy backed college which will produce the scientists and engineers of tomorrow.

CAA launching new airspace change process

In 2015 the CAA started reviewing its airspace change process and after nearly three years of detailed work and two public consultations, it is now launching its new process which will take effect from 2nd January 2018.

SMI NCWSK2011171217
See us at
FIL18 BT111017220718SMI FAVSABT2411120418SMI NCWBT3110020218Aviation Africa BT18418S&P BT281117080318